I. Introduction
Dau Giay Industrial Park located in Dong Nai Province, on an important traffic hub of the southern key economic region, Dong Nai has many favorable conditions in terms of road, waterway and airway to attract tourists. investment and socio-economic development.
Name: Dau Giay Industrial Park – Dong Nai
Total area: 329ha
Address: Bau Ham 2 commune, Thong Nhat district, Dong Nai province
Investor: DAUGIAY-IP-DNA
Operation Period: 01/2008
Building Density: 60%
Fill rate: 80%
II. Location
Dau Giay Industrial Park is located in Bau Ham 2 Commune, Thong Nhat District, Dong Nai Province with a convenient location for both waterway and road traffic, located at the intersection between National Highway 1, National Highway 20 and the road. Province 769, Ho Chi Minh City – Long Thanh – Dau Giay Expressway.
• 38 km away from Bien Hoa City
• 70km away from Tan Son Nhat airport
• 1km away from Dau Giay Station
• 38km away from Bien Hoa Port
III. Infrastructure
• Power supply:
110KV Dau Giay power station supplies power from the 500KV North-South line with capacity of 63MVA and 22KV from grid system.
• Water supply:
Water supply system to each factory fence with a capacity of 1200 m3/day
• Telecommunication:
Convenient telecommunications system, ADSL high-speed Internet connection provided by VNPT Dong Nai
• Drainage system:
The drainage system installed along the internal traffic routes can ensure the collection of all rainwater and wastewater from factories in the industrial park.
Wastewater is treated at a factory with a capacity of 2000m3/day located in the industrial park
• Transportation:
The main axis system has 4 lanes of 15m wide, the internal traffic system is 11.25m wide with 2 lanes
• Fire system
Used in conjunction with the water supply system, the fire hydrants are located along the road with an average distance of about 150m/fire hydrants
IV. Prioritized Industries
• Mechanical, electrical – electronic, information technology
• Pharmaceutical chemicals, flavorings, cosmetics
• Textile, leather shoes
• Building materials
• Producing and processing agricultural, forestry and aquatic products
• Handicrafts, stationery
Project Overview
- Name
- Dau Giay Industrial Park – Dong Nai
- Total area
- 329ha
- Address
- Bau Ham 2 commune, Thong Nhat district, Dong Nai province
- Investor
- DAUGIAY-IP-DNA
- Operation Period
- 01/2008
- Building Density
- 60%
- Fill rate
- 80%
Utilities
Location
Dau Giay Industrial Park
Investors & Partners
DAUGIAY-IP-DNA
Investor
Căn hộ dự án
No posts found